Mono widening still too costly

Chris Caskey, The Union Democrat

The cost of the multi-million-dollar Mono Way widening project in Sonora remains higher than originally expected despite a second round of bids by the city.

Three contractors submitted proposals this month for the project, which calls for widening the stretch of Mono Way from Greenley Road to Fir Drive to ease traffic, as well as building a retaining wall, replacing a 36-inch culvert and earthwork.

The lowest bid came from Modesto-based George Reed Inc. at $3.9 million, with Sierra Mountain Construction of Sonora ($4.35 million) and McGuire and Hester of Oakland ($4.9 million) also submitting bids.

The last round of bids ranged from $3.4 million to $4.6 million, and were thrown out because they exceeded the initial $2.7 million project estimate. The Sonora City Council opted to re-advertise in December.

However, Sonora City Engineer Gerard Fuccillo said the latest round of bids also included alternative proposals lowering costs on a retaining wall and culvert replacement that are part of the widening. Under one, a retaining wall that will stretch from Roselyn Lane to Fir Drive would have a typical concrete face instead of a decorative rock facade.

For the full story see today's Union Democrat.

11914768
The Union Democrat
This image is copyrighted.

Reach all of Sonora, Calaveras County, Tuolumne, Angels Camp, Twain Harte, & Jamestown with your items to sell.

Ads appear Online and in Print

View Classifieds Place an Ad

Connect with The Union Democrat

Union Democrat Newsstand

Sunday September 25, 2016

Read digital interactive editions of our publications

Read Today's Edition Take A Tour

More Publications by The Union Democrat

View All Publications
Walking Man of Murphys hits milestone

09/22/2016

Thursday marked the eighth anniversary since Ric Ryan began his trek as ... more

Light snow forecast for the Central Sierra

09/21/2016

The coldest day of the changing season is expected Thursday across the ... more