Summer Hwy 120 delays expected

Chris Caskey, The Union Democrat

A multi-year road retrofit project on Highway 120, centered around a bridge east of Buck Meadows, will mean traffic delays heading into Yosemite National Park through the summer season, according to Caltrans.

Work is set to begin Wednesday between the Big Oak Sidehill Viaduct bridge and the South Fork Tuolumne River bridge past Yosemite Lakes Road, according to Caltrans. The project, near the Lost Claim Campground, touches on both Tuolumne and Mariposa counties and is supposed to last through 2016. During construction, one lane of the two-lane route will be closed, although traffic will be able to get through.

The project involves road repairs and replacing the bridge decks to strengthen the bridge and is expected to cost $3.4 million. The route is a popular stretch of road in Tuolumne County as the northern entrance to Yosemite National Park.

According to Caltrans estimates, as many as 9,000 vehicles a day pass through that stretch of Highway 120 during peak summer months. According to the Caltrans data, with up to 1,050 an hour during peak hours.

11899229
The Union Democrat
This image is copyrighted.

Reach all of Sonora, Calaveras County, Tuolumne, Angels Camp, Twain Harte, & Jamestown with your items to sell.

Ads appear Online and in Print

View Classifieds Place an Ad

Connect with The Union Democrat

Union Democrat Newsstand

Friday September 30, 2016

Read digital interactive editions of our publications

Read Today's Edition Take A Tour

More Publications by The Union Democrat

View All Publications
Fire threatens Hetch Hetchy infrastructure

09/26/2016

A fire burning in grass and oak woodland near the Moccasin Powerhouse ... more

Marshes Fire grows to 1,000 acres

09/27/2016

Firefighters with dirty faces and bulldozer drivers clad in fire-retardant gear toiled ... more

Hazard tree removal delayed

09/27/2016

Removal of trees destroyed last year by the Butte Fire may not ... more